Wednesday, January 13, 2010

16 inches of dirt excavated along this particular wall, 1-4 inches of base gravel was laid, then a perforated 4" pipe along with a solid drain pipe for gutters was laid along the slope, which was later backfilled with 8-10 inches of more gravel.